| Home > What we do > Hydro Power |
| Hydro Power |
| |
The following Hydro Power projects undertaken by Soma give a glimpse of it's activities for “Energizing the Nation with Engineering”. |
| |
| 2000 MW Subansiri Lower Hydroelectric Project |
| Lot SSL-1 : Civil works for Diversion Tunnels, Coffer Dams, Concrete Gravity Dam, Plunge Pool and Cutoff Wall in Assam & Arunachal Pradesh, India |
 |
|
 |
| Dam |
: |
| Height of Dam |
: |
133m |
| Length of Dam |
: |
271m |
|
| Diversion Tunnels |
: |
| Diameter |
: |
9.5m |
| Nos |
: |
5, Length - 2815m |
| Discharge |
: |
4550 Cumecs |
|
| Coffer Dams |
: |
| U/s Height |
: |
31m |
| D/s Height |
: |
21m |
|
| Spillway |
: |
| Design flood |
: |
37,500 Cumecs |
| Spillway |
: |
9 nos. of 11.5m wide |
| Cut off wall below Dam foundation |
| Depth |
: |
50m |
| Length |
: |
410m |
| Design flood |
: |
37,500 Cumecs |
|
| Contract Value |
: |
Rs. 10983 Million (US$ 246 Million) |
| Employer |
: |
National Hydro Electric Power Corporation Ltd. |
| Major Quantities |
: |
| Excavation in Soils |
: |
1,136,500 M3 |
| Concrete |
: |
2,421,100 M3 |
| Underground Excavation |
: |
350,000 M3 |
| Excavation in Hardrock |
: |
2,066,000 M3 |
| HYSD |
: |
52,874 MT |
| Shotcrete |
: |
31,000 M3 |
| Drilling |
: |
205,400 M |
| Grouting |
: |
12,553 MT |
| Rock Anchors |
: |
273,733 M |
| Tendons |
: |
10,000 M |
|
| Joint Venture Partners |
: |
"Boguchangesstroy", Russia - "Soyuzgidrospetsstroy", Russia |
|
| |
| Top |
| |
| Koyna Dam Strengthening |
| Strengthening of Overflow portion of Koyna Dam |
 |
|
 |
Contract Value |
: |
Rs. 10398 lakhs (US$ 21 Million) |
Employer |
: |
Water Resources Department, Government of Maharashtra |
| Major Quantities |
: |
| Excavation in Hard rock |
: |
88,574 M3 |
| Embankment |
: |
39,103 M3 |
| Concrete |
: |
149,607 M3 |
| HYSD |
: |
1,181 MT |
|
|
| |
| Top |
| |
| Sipat STPP Stage-I |
| Raw Water Reservoir and its Lining Package for Sipat STPP, Stage-I (3x660 MW), Chattisgarh |
 |
|
 |
| Contract Value |
: |
Rs. 540 Million (US$ 12 Million) |
| Employer |
: |
NTPC Limited |
| Major Quantities |
: |
| Excavation in Soils |
: |
650,000 M3 |
| Excavation in Hard rock |
: |
1,100,000 M3 |
| Embankment |
: |
3,730,000 M3 |
| Prestreesed Concrete |
: |
20,000 M3 |
| HYSD |
: |
210 MT |
| HDPE Lining |
: |
400,000 M2 |
|
|
| |
| Top |
| |
| |
|
|
|