Home > What we do > Completed Projects
Completed Projects
This section contains a brief overview of the projects that have been completed by Soma . If you would like more detailed information about any of the projects, please contact us at info@somaenterprise.com .
AP - 18 Project (84.5 Km)
Widening to 4/6 lanes and Strengthening of Existing 2-lane Carriageway of NH-5 in Vijayawada - Visakhapatnam Section in the State of Andhra Pradesh from Km 80.000 to Km 164.500 (Gundugolanu near Eluru to Gowthami Bridge)
Contract Value
:
Rs. 3080 Million (US$ 69 Million)
Employer
:
National Highways Authority of India
Major Quantities
:
Excavation in Soils
:
1,784,062 M3
Embankment
:
4,710,369 M3
Concrete
:
125,555 M3
HYSD
:
3,646 MT
Subgrade
:
1,033,681 M3
GSB
:
488,888 M3
WMM
:
314,994 M3
DBM
:
252,014 M3
BC
:
57,395 M3
Joint Venture Partner
:
Limak Construction Industry & Trade INC
Top
Koyna Tunnel
Extension of 3352 M long Head Race Tunnel for Koyna HE Project, Stage-IV, Length 3345 M, Horse Shoe Dia 9.5 m
Contract Value
:
Rs. 2200 Million (US$ 48 Million)
Employer
:
Water Resources Department, Government of Maharashtra
Major Quantities
:
Excavation in Soils
:
85,453 M3
Excavation in Hard rock
:
1,665 M3
Underground Excavation
:
321,635 M3
Permanent Steel supports
:
152 MT
Concrete
:
1,430 M3
HYSD
:
7,708 MT
Shotcrete
:
4,395 M3
Rock bolts
:
26,535 M
Grouting
:
110 KG
Top
Nellore Bypass (17.5 Km) - BOT - Annuity
Construction of 17 Km long 4-lane partial Access controlled Bypass on BOT basis on Annuity Approach
Contract Value
:
Rs. 1530 Million (US$ 34 Million)
Employer
:
National Highways Authority of India
Major Quantities
:
Excavation in Soils
:
72,440 M3
Embankment
:
1,328,198 M3
Concrete
:
74,643 M3
HYSD
:
7,010 MT
Subgrade
:
198,386 M3
GSB
:
133,875 M3
WMM
:
104,742 M3
DBM
:
42,831 M3
BC
:
13,609 M3
Investment Rs. 1530 Million (US$ 34 Million)
Annuity Amount : Rs. 129.60 Million (US$ 2.81 Million)
Concession Period - 17 years
Construction 2 years
O & M - 15 years
Joint Venture Partner
:
Navayuga Engineering Company Ltd
Top
Temghar Dam
Construction of Masonry Dam (Right Flank monoliths 16 to 27) across river Mutha, near Village Temghar, Tal. Mulshi Dist. Pune of Maharashtra State, Height of Dam - 71M.
Contract Value
:
Rs. 1279 Million (US$ 29 Million)
Employer
:
MKVDC (Maharashtra Krishna Valley Development Corporation)
Major Quantities
:
Excavation in Soils
:
141,378 M3
Excavation in Hard rock
:
267,651 M3
Concrete
:
21,022 M3
Masonry-UCR
:
421,923 M3
Masonry-Colgrout
:
322,335 M3
HYSD
:
5,995 MT
Top
Nira Deoghar Earth Dam
Construction of Earthen Dam including gated masonry spillway, tail & approach channel and head regulator for Nira Deoghar Project, Maharashtra, Height of Dam - 58.525 M
Contract Value
:
Rs. 1247 Million (US$ 28 Million)
Employer
:
MKVDC (Maharashtra Krishna Valley Development Corporation)
Major Quantities
:
Excavation in Soils
:
781,803 M3
Excavation in Hard rock
:
817,048 M3
Embankment
:
5,450,184 M3
Concrete
:
51,590 M3
Masonry-UCR
:
16,382 M3
Masonry-Colgrout
:
30,193 M3
HYSD
:
3,361 MT
Top
Maddur - Mysore (49 Km)
4 laning of SH-17 (Bangalore - Mysore Road) from Maddur to Mysore Km. 82.500 to Km. 135.350 (excluding Km. 97.200 to Km. 101.00)
Contract Value
:
Rs. 1162 Million (US$ 26 Million)
Employer
:
Karnataka Road Development Corporation Ltd.,
Major Quantities
:
Excavation in Soils
:
564,164 M3
Embankment
:
548,317 M3
Masonry-Colgrout
:
30,193 M3
HYSD
:
2,233 MT
Subgrade
:
509,686 M3
GSB
:
197,597 M3
WMM
:
203,158 M3
DBM
:
118,632 M3
BC
:
38,302 M3
Top
Tarali Dam
Construction of Masonry Dam with gated spillway across river Tarali at Dangistewadi, Tal. Patan, Dist. Satara, Maharashtra
Contract Value
:
Rs. 1019 Million (US$ 23 Million)
Employer
:
MKVDC (Maharashtra Krishna Valley Development Corporation)
Major Quantities
:
Excavation in Soils
:
89,255 M3
Excavation in Hard rock
:
147,481 M3
Embankment
:
15,121 M3
Concrete
:
30,115 M3
Masonry-UCR
:
498,669 M3
Masonry-Colgrout
:
111,841 M3
HYSD
:
3,364 MT
Top
Orsang Aqueduct
Construction of Aqueduct across River Orsang on Narmada, Length - 548.10M Canal discharge - 1129 cumecs. Main Canal at Ch. 48.590 Km.
Contract Value
:
Rs. 946 Million (US$ 21 Million)
Employer
:
Sardar Sarovar Narmada Nigam Ltd.,
Major Quantities
:
Embankment
:
845,200 M3
Concrete
:
222,255 M3
CC Lining
:
34,488 M2
HYSD
:
16,225 MT
Top
Koyna Dam Strengthening
Strengthening of Overflow portion of Koyna Dam
Contract Value
:
Rs. 10398 lakhs (US$ 21 Million)
Employer
:
Water Resources Department, Government of Maharashtra
Major Quantities
:
Excavation in Hard rock
:
88,574 M3
Embankment
:
39,103 M3
Concrete
:
149,607 M3
HYSD
:
1,181 MT
Top
Prakasha Barrage - 503 M long (incl. approaches 708m)
Construction of Prakasha Barrage Medium Project near village Prakasha, Tal. Shahada Dist. Nandurbar, Maharashtra
Contract Value
:
Rs. 865 Million (US$ 19 Million)
Employer
:
TIDC (Tapi Irrigation Development Corporation)
Major Quantities
:
Excavation in Soils
:
110,437 M3
Excavation in Hard rock
:
379,434 M3
Concrete
:
98,794 M3
Masonry-UCR
:
47,436 M3
Masonry-Colgrout
:
84,493 M3
HYSD
:
5,281 MT
Top
Purna Project
Construction of Central gated spillway Tail Channel, Irrigation cum Power outlet and balance earth work of Right & Left Flank of Dam of Purna Project, Achalpur, Distt. Amaravati, Maharashtra. Height of Dam - 40M
Contract Value
:
Rs.850 Million (US$ 18 Million)
Employer
:
Vidarbha Irrigation Development Corporation (VIDC)
Major Quantities
:
Excavation in Soils
:
288,229 M3
Excavation in Hard rock
:
159,274 M3
Embankment
:
657,029 M3
Concrete
:
33,911 M3
Masonry-UCR
:
238,699 M3
Masonry-Colgrout
:
57,661 M3
HYSD
:
377 MT
Top
Alaganuru Balancing Reservoir
Formation of Alaganuru Balancing Reservoir near Alaganuru village, comprising work of Formation of Earthen Bund, Surplus regulator, Head Sluice, Tank Sluice, Diversion Road and Protection Bund for K.C. Canal.
Contract Value
:
Rs. 770 Million (US$ 17 Million)
Employer
:
Irrigation Dept., Govt.of Andhra Pradesh
Major Quantities
:
Excavation in Soils
:
316,366 M3
Excavation in Hard rock
:
52,682 M3
Earth Fill
:
3,116,564 M3
Concrete
:
10,723 M3
Sand Filter
:
362,948 M3
Top
Madikheda Dam
Construction of Masonry Dam from RD 232.75 M to RD 576.5 M of Madikheda Masonry Dam
Contract Value
:
Rs. 600 Million (US$ 13 Million)
Employer
:
WRD (Govt. of Madhya Pradesh)
Major Quantities
Concrete
:
85,000 M3
Masonry
:
170,000 M3
Top
Ranganadi Main Tunnel
Construction of Ranganadi Main Tunnel from '0' chainage including intake structure upto chainage 6649 M for diverting water to Dikrong Power House, Dist. Lower Subansiri, Arunachal Pradesh, Length - 6649 M, Horse Shoe, Dia - 6.8 M
Contract Value
:
Rs. 502 Million (US$ 11 Million)
Employer
:
North Eastern Electric Power Corporation Ltd.
Major Quantities
:
Excavation in Soils
:
19,404 M3
Excavation in Hard rock
:
73 M3
Underground Excavation
:
17,106 M3
Concrete
:
2,764 M3
CC Lining
:
61,376 M3
Shotcrete
:
3,631 M3
Permanent Steel supports
:
219 MT
Grouting
:
512,625 Bags
Top
Teesta HE Project - Diversion Tunnels
Construction of Diversion Tunnels (2 Nos.) of Teesta H.E. Project Stage-V, Sikkim, Length - 1080 M, Horse Shoe, Dia - 12.2 M.
Contract Value
:
Rs. 490 Million (US$ 11 Million)
Employer
:
National Hydro Electric Power Corporation Ltd.
Major Quantities
:
Excavation in Soils
:
121,528 M3
Excavation in Hard rock
:
30,761 M3
Underground Excavation
:
165,807 M3
Concrete
:
12,966 M3
CC Lining
:
51,906 M3
HYSD
:
1,728 MT
Shotcrete
:
3,065 M3
Permanent Steel supports
:
301 MT
Rock bolts
:
30,256 M
Grouting
:
789,650 KG
Top
Khambale Tunnel
Construction of Tunnel & Deepcut at Khambale Ch. 2643 M to 5951 M, Length 2974 M, D-shape 8 X 3 m.
Contract Value
:
Rs. 285 Million (US$ 6 Million)
Employer
:
MKVDC (Maharashtra Krishna Valley Development Corporation)
Major Quantities
:
Excavation in Soils
:
18,071 M3
Excavation in Hard rock
:
157,782 M3
Underground Excavation
:
140,392 M3
Concrete
:
12,418 M3
HYSD
:
199 MT
Permanent Steel supports
:
111 MT
Rock bolts
:
11,962 M
Joint Venture Partner
:
Gammon India Ltd.
Top
Takari Pump House
Construction of balance work of Takari Pump House Stage 1st at Takari, Tal: Walva, Dist. Sangli, Maharashtra
Contract Value
:
Rs. 245 Million (US$ 6 Million)
Employer
:
MKVDC (Maharashtra Krishna Valley Development Corporation)
Top
Kamshet Tunnel on the Mumbai - Pune Expressway
Construction of Kamshet 1A Twin Tube Tunnel for Mumbai - Pune Expressway between chainages 11840 M to 12460 M, Length - 957 M, D-Shape, Dia - 18M
Contract Value
:
Rs. 215 Million (US$ 5 Million)
Employer
:
Konkan Railway Corporation Ltd.,
Major Quantities
:
Excavation in Soils
:
36,266 M3
Excavation in Hard rock
:
137,492 M3
Underground Excavation
:
151,711 M3
Concrete
:
9,622 M3
CC Lining
:
3,243 M3
Shotcrete
:
47,738 M3
Rock bolts
:
77 MT
Top
Noida Expressway - Package - IV-B
Road work till WMM stage (Excluding Asphalt Work) for the Expressway between Noida and Greater Noida - Package-IV B (Km 7+000 to Km 10+000)
Contract Value
:
Rs. 161 Million (US $ …….. Million)
Employer
:
IRCON International Ltd.,
Major Quantities
:
Earthwork
:
664,555 cum
GSB
:
37,121 cum
WMM
:
28,523 cum
Top
Noida Expressway - Package - II
Construction of Expressway between Noida and Greater Noida - Km. 0.00 to 4.00 (NOIDA SIDE) - Package - II
Contract Value
:
Rs. 159 Million (US$ ………. Million)
Employer
:
IRCON International Ltd.,
Major Quantities
:
Earthwork
:
304,599 cum
Subgrade
:
137,909 cum
GSB
:
49,463 cum
WMM
:
36,000 cum
Concrete
:
1,760 cum
Top
Khandala Tunnel on the Mumbai - Pune Expressway
Construction of Single Tube Tunnel from Ch. 6600 M to 6930 M and Widening of Existing Road Tunnel from Ch. 6600 M to 6955 M at Khandala (Mumbai End), including shotcreting, Concrete Lining, Rock Bolting etc., for Mumbai - Pune Expressway, Length - 330 M, D-shape Dia - 18M
Contract Value
:
Rs. 65 Million (US$ 1 Million)
Employer
:
Konkan Railway Corporation Ltd.,
Top