header-bg Soma Enterprise Ltd.
Home Site Map
header bg
  Company   What We Do   Clients   Partners   Careers   Media Center   Contact
spacer
left dot Hydro Power
left dot Irrigation and Water Resources
left dot Transportation
left dot Tunnels
left dot Urban Infrastructure
left dot Real Estate
 
Home > What we do > Current Projects
Current Projects
 

Soma is currently executing major infrastructure projects at various locations in the country. Please browse through this section for a brief overview of the projects. If you would like more detailed information about any of the projects, please contact us at info@somaenterprise.com.

 
arrow Nira Deoghar Projectt  arrow Shivpuri (MP-1)
arrow Prakasha Barrage arrow RJ-2

arrow Bhosa - Khind Tunnel

arrow Pimpalgaon – Dhule
arrow Parbati Head race tunnel arrow Digras High Level Barrage
arrow Babhali Barrage arrow Bhiladi – Jetpur- Gujarat-Package – II
arrow Subansiri Lower HE Project 2000 MW arrow Bangalore Elevated Express way
arrow Polavaram Project(RMC) arrow MRTSprojectway
arrowPolavaram Project(LMC)
arrow Vamsadhara Project arrow ICTT at Vallarpadam, Cochin
arrow RJ-6 arrow Adilabad
arrow Dhapewada  
 
 
2000 MW Subansiri Lower Hydroelectric Project
Lot SSL-1 : Civil works for Diversion Tunnels, Coffer Dams, Concrete Gravity Dam, Plunge Pool and Cutoff Wall in Assam & Arunachal Pradesh, India
Dam :
Height of Dam : 133m
Length of Dam : 271m
Diversion Tunnels   :
Dia : 9.5m
Nos : 5, Length - 2815m
Discharge : 4550 Cumecs
Coffer Dams :
U/s Height : 31m
D/s Height : 21m
Spillway :
Design flood : 37,500 Cumecs
Spillway : 9 nos. of 11.5m wide
Cut off wall below Dam foundation
Depth : 50m
Length : 410m
Contract Value : Rs. 10983 Million (US$ 246 Million)
Employer : National Hydro Electric Power Corporation Ltd.
Major Quantities :
Excavation in Soils : 1,136,500  M3
Concrete : 2,421,100 M3
Underground Excavation : 350,000 M3
Excavation in Hardrock : 2,066,000 M3
HYSD : 52,874 MT
Shotcrete : 31,000 M3
Drilling : 205,400  M
Grouting : 12,553 MT
Rock Anchors : 273,733 M
Tendons : 10,000 M
Joint Venture Partners : "Boguchangesstroy", Russia - "Soyuzgidrospetsstroy", Russia
 
Top
 
Bangalore Elevated Expressway
Construction of Elevated Highway Project on Bangalore - Hosur Section of NH-7 from Silk Board Junction (Km. 8/765 to 18/750) to Electronic City Junction on BOT basis
Contract Value : Rs. 7560 Million (US $ 168 Million)
Employer : National Highways Authority of India
Major Quantities :
Earthwork : 500,000 M3
DBM : 150,000 M3
Concrete : 300,000 M3
Steel : 40,000 MT
HT Strands : 4,000 MT
Joint Venture Partner : Nagarjuna Construction Company Ltd.
 
Top
 
Pimpalgaon - Dhule (115 Km) BOT
Rehabilitation and strengthening of existing 2-lane road and widening to 4-lane divided highway of Km. 380 to Km 265 of NH-3 (Pimpalgaon - Dhule Section) in the state of Maharasthra on BOT basis
Contract Value : Rs. 6040 Million (US$ 134 Million)
Employer : National Highways Authority of India
Major Quantities :
Excavation in Soils : 790,416 M3
Excavation in Hard rock : 479,451 M3
Embankment : 1,872,431 M3
Concrete : 163,371 M3
HYSD : 3,640  MT
Subgrade : 922,948 M3
GSB : 538,201 M3
WMM : 493,270 M3
DBM : 312,465 M3
BC : 115,990 M3
Joint Venture Partner : IRCON International Ltd.
 
Top
 
RJ-2 Project (44 Km)
East - West Corridor Project  - Package No. EW-II (RJ-2) Rehabilitation and Upgradation of Bekaria - Gogunda Section Km. 29.00 to Km. 73.00 of NH-76 to 4 lane divided carriageway configuration in the State of Rajasthan
Contract Value : Rs. 4116 Million (US$ 92 Million)
Employer : National Highways Authority of India
Major Quantities :
Excavation in Soils : 708,450 M3
Excavation in Ordinary rock : 2,034,500 M3
Excavation in Hard rock : 3,818,050 M3
Underground Excavation : 101,450 M3
Embankment : 3,450,900 M3
Concrete : 222,445 M3
Prestressed Concrete : 3,850 M3
HYSD : 9,702 MT
Subgrade : 621,100 M3
GSB : 242,850 M3
WMM : 223,850 M3
DBM : 98,000 M3
BC : 33,470 M3
Shotcrete : 55,600 Sqm
Permanent Steel Supports : 6,580 MT
Drilling : 54,300 M
Grouting : 65 MT
Joint Venture Partner : B.Seenaiah &Co.(Projects)Ltd.
 
Top
 
Vamsadhara Project Phase - II
(Hiramandalam Reservoir)
Earth Dam for Hiramandalam Reservoir
Contract Value : Rs. 3535 Million (US$ 79 Million)
Employer : Irrigation Dept., Govt. of Andhra Pradesh
Major Quantities :
Excavation in Soils : 34,29,000 M3
Excavation in Hard rock : 3,20,000 M3
Embankment : 214,00,000 M3
Concrete : 1,86,000 M3
CC Lining : 17,000 M3
HYSD : 3500 MT
Joint Venture Partners : Patel Engineering Ltd. - ASI RCC INC
 
Top
 
MP-1 Project (55 Km)
Rehabilitation and upgrading of Km 579.000 to Km 610.000 of NH-76 (Rajasthan/MP Border to Junction of NH-76/NH-3) to 4-lane configuration and construction of 4-lane Shivpuri Bypass connecting NH-76 to NH-25 in the State of Madhya Pradesh
Contract Value : Rs.2950 Million (US$ 66 Million)
Employer : National Highways Authority of India
Major Quantities :
Excavation in Soils : 808,700 M3
Excavation in Hard rock : 358,700 M3
Embankment : 2,532,000 M3
Concrete : 96,800 M3
HYSD : 7,800 MT
Subgrade : 788,000 M3
GSB : 303,000 M3
WMM : 265,000 M3
DBM : 139,720 M3
BC : 53,000 M3
Joint Venture Partners : China State Construction Engineering (Hong Kong) Ltd.
 
Top
 
Indira Sagar Project (Polavaram) Left Main Canal Package-II
Excavation, Formation, Lining & Construction of CM & CD works from Km. 25.60 to Km. 51.60 of Polavaram Left Main Canal on EPC Turnkey system
Contract Value : Rs.2425 million (US$ 54 Million)
Employer : Irrigation Dept., Govt. of Andhra Pradesh
Major Quantities :
Excavation in Soil including SDR & HDR : 2,08,00,000 M3
Embankment : 31,100 M3
Concrete : 80,000 M3
CC Lining : 2,00,000 M3
HYSD : 4,800 MT
Joint Venture Partner : Patel Engineering Ltd.
 
Top
 
Indira Sagar Project (Polavaram) Right Main Canal Package-I
Excavation, Formation, Lining & Construction of CM & CD works from Km. 0.00 to Km. 14.80 of Polavaram Right Main Canal on EPC Turnkey system
polavaram right main canal
Contract Value : Rs.2415 Million (US$ 54 Million)
Employer : Irrigation Dept., Govt. of Andhra Pradesh
Major Quantities :
Excavation in Soils including Soft rock HDR, F & F and Hard rock : 6,741,900 M3
Embankment : 4,12,600 M3
Concrete : 1,00,000 M3
CC Lining : 1,54,000 M3
HYSD : 6,000 MT
Joint Venture Partner : Patel Engineering Ltd.
 
Top
 
Porbandar - Bhiladi Highway on NH-8B, Gujarat Package-I
Rehabilitation and Upgrading of Porbandar - Bhiladi Highway Section of NH-8B from Km 2.00 to Km 52.50 - Package - I
Contract Value : Rs. 1932 Million (US$ 43 Million)
Employer : National Highways Authority of India
Major Quantities :
Excavation in Soils : 240,850 M3
Embankment : 1,259,000 M3
Concrete : 142,020 M3
HYSD : 10,005  MT
Subgrade : 627,000 M3
GSB : 241,500 M3
WMM : 283,500 M3
DBM : 136,300 M3
BC : 54,700 M3
Joint Venture Partner : Limak Construction Industry & Trade INC, Turkey
 
Top
 
SRSP Flood Flow Canal Package-I
Earth work excavation, forming embankment and construction of CM & CD works of Flood Flow Main Canal from 28.40 Km. to 43.00 Km. on EPC Turnkey System for Sri Ramsagar Project - Flood Flow Canal Package - I
srsp flood flow canal
Contract Value : Rs. 1655 Million (US$ 37 Million)
Employer : Irrigation Department, Government of Andhra Pradesh
Joint Venture Partner : Patel Engineering Ltd.
 
Top
 
Digras Barrage
Construction of Digras High Level Barrage including providing & fixing vertical lift type gates, Tq. Palam, Distt. Parbhani, Maharashtra
Contract Value : Rs. 1065 Million (US$ 23 Million)
Employer : GMIDC (Godavari Marathwada Irrigation Development Corporation)
Major Quantities :
Excavation in Soils : 396,000 M3
Excavation in Hard Strata : 42,000 M3
Embankment : 208,000 M3
Concrete : 126,000 M3
HYSD : 2,032 MT
Vertical Lift Type Gates : 3,155 MT
 
Top
 
Babhali Barrage
Construction of Babhali Barrage and its Gates near Village Babhali Tq. Dharmabad, Dist. Nanded, Maharashtra
Contract Value : Rs. 1043 Million (US$ 23 Million)
Employer : GMIDC (Godavari Marathwada Irrigation Development Corporation)
Major Quantities :
Excavation in Soils : 131,271 M3
Excavation in Hard rock : 26,210 M3
Embankment : 137,103 M3
Concrete : 90,416 M3
HYSD : 1,848 MT
Drilling : 1,848 M
Fabrication & Erection of Gates : 3,155 MT
 
Top
 
Bhiladi - Jetpur Section - Pkg-II
Rehabilitation and upgrading of Bhiladi - Jetpur Road Section of NH-8B from Km 53.05 to 117.00 in the State of Gujarart - Package-II
bhiladi
Contract Value : Rs. 850 Million (US$ 18.31 Million)
Employer : National Highways Authority of India
Major Quantities :
Excavation in Soils : 157,022 M3
Embankment : 928,172 M3
Concrete : 85,285 M3
HYSD : 8,463 MT
Subgrade : 238,622 M3
GSB : 82,000 M3
WMM : 107,000 M3
DBM : 52,573 M3
BC : 4,500 M3
 
Top
 
Bhosa-Khind Tunnel
Construction of Bhosa - Khind Tunnel and Approach Canal at Ch. 166/190 of Kukadi Left Bank Canal, Tal. Karjat, Dist. Ahmednagar, Maharashtra,  Length - 16310 M, Dia - 5.75M
Kukadi
Contract Value : Rs. 789 Million (US$ 18 Million)
Employer : MKVDC (Maharashtra Krishna Valley Development Corporation)
Major Quantities :
Excavation in Soils : 34,578 M3
Excavation in Hard rock : 275,165 M3
Underground Excavation : 420,717 M3
Concrete : 47,100 M3
CC Lining : 25,815 M2
Shotcrete : 23,500 M2
Joint Venture Partner : Sri Sai Krishna Construction Co.
 
Top
 
Parabati Head Race Tunnel
Underground works (Head Race Tunnel) from RD 24733 M to RD 29726M and Approach Adit No. 4 of length 390 M for Parbati Hydroelectric Project Stage II
Contract Value : Rs. 775 Million (US$ 17 Million)
Employer : National Hydro Electric Power Corporation Ltd.,
Major Quantities :
Underground Excavation : 242,150 M3
CC Lining : 79,170 M3
Reinforced Steel : 580 MT
Shotcrete : 12,760 M3
Permanent Steel supports : 1,914 MT
Rock bolts : 4,698 M
Drilling : 47,560 M
Grouting : 2,568,820 Kgs
Concrete Lining : 79,170 M3
 
Top
 
Mongra Barrage
Construction of Concrete Barrage including supply and installation of Radial gates ( 10 nos. 14.50 M X 8.85 M) right and left bank sluices and earthen afflux bund of Mongra Barrage, Length of Barrage - 182M
Contract Value : Rs. 698 Million (US$ 16 Million)
Employer : Water Resources Department, Government of Chattisgarh
Major Quantities :
Earthwork : 710,978 M3
Embankment : 175,915 M3
Concrete : 100,218 M3
Pitching : 28,863 M3
Fabrication & Erection of Gates,Hoists etc. : 1,050 MT
 
Top
 
Sipat STPP Stage-I
Raw Water Reservoir and its Lining Package for Sipat STPP, Stage-I (3x660 MW), Chattisgarh
Contract Value : Rs. 540 Million (US$ 12 Million)
Employer : NTPC Limited
Major Quantities :
Excavation in Soils : 650,000 M3
Excavation in Hard rock : 1,100,000 M3
Embankment : 3,730,000 M3
Prestreesed Concrete : 20,000 M3
HYSD : 210 MT
HDPE Lining : 400,000 M3
 
Top
 
Mongra Left Branch Canal
Construction of Left Branch Canal from 0 to 33.50 Km. Dongargaon distributory from 0 to 14 Km. including earth work, structures and construction of 2 Nos. tunnels (2.00 km & 1 km) long in canal alignment complete of Mongra Project