Tunnels
 

The following Projects undertaken by Soma “Demonstrate Soma’s Engineering Excellence”.

 
Koyna Tunnel
Extension of 3352 M long Head Race Tunnel for Koyna HE Project, Stage-IV, Length 3345 M, Horse Shoe, Dia 9.5 M

Contract Value

: Rs.2500 Million (US$ 56 Million)

Employer

:

Water Resources Department, Government of Maharashtra

Major Quantities

:
 Excavation in Soils :  85,453 M3
 Excavation in Hard rock :  1,665 M3
 Underground Excavation :  321,635 M3
 Permanent Steel supports :  152 MT
 Concrete :  1,430 M3
 HYSD :  7,708 MT
 Shotcrete :  4,395 M3
 Rock bolts :  26,535 M
 
Top
 
Bhosa-Khind Tunnel
Construction of Bhosa - Khind Tunnel and Approach Canal at Ch. 166/190 of Kukadi Left Bank Canal, Tal. Karjat, Dist. Ahmednagar, Maharashtra
Kukadi
Contract Value : Rs.600 Million (US$ 14 Million)
Length : 16310 M
Dia : 5.75M
Employer : MKVDC (Maharashtra Krishna Valley Development Corporation)
Major Quantities :
 Excavation in Soils :  34,578 M3
 Excavation in Hard rock :  275,165 M3
 Underground Excavation :  420,717 M3
 Concrete :  47,100 M3
 CC Lining :  25,815 M2
 Shotcrete :  23,500 M2
 
Top
 
Parabati Head Race Tunnel
Underground works (Head Race Tunnel) from RD 24733 M to RD 29726M an Approach Adit No. 4 of length 390 M for Parbati Hydroelectric Project Stage II
Contract Value : Rs. 775 Million (US$ 17 Million)
Employer : National Hydro Electric Power Corporation Ltd.,
Major Quantities :
 Underground Excavation :  242,150 M3
 CC Lining :  79,170 M3
 Reinforced Steel :  580 MT
 Shotcrete :  12,760 M3
 Permanent Steel supports :  1,914 MT
 Rock bolts :  4,698 M
 Drilling :  47,560 M
 Grouting :  2,568,820 Kgs
 Concrete Lining :  79,170 M3
 
Top
 
Ranganadi Main Tunnel
Construction of Ranganadi Main Tunnel from '0' chainage including intake structure upto chainage 6649 M for diverting water to Dikrong Power House, Dist. Lower Subansiri, Arunachal Pradesh, Length - 6649 M, Horse Shoe, Dia - 6.8 M

Contract Value

: Rs. 502 Million (US$ 11 Million)

Employer

:

North Eastern Electric Power Corporation Ltd.

Major Quantities :
 Excavation in Soils :  19,404 M3
 Excavation in Hard rock :  73 M3
 Underground Excavation :  17,106 M3
 Concrete :  2,764 M3
 CC Lining :  61,376 M3
 Shotcrete :  3,631 M3
 Permanent Steel supports :  219 MT
 Grouting :  512,625 Bags
 
Top
 
Teesta HE Project - Diversion Tunnels
Construction of Diversion Tunnels (2 Nos.) of Teesta H.E. Project Stage-V, Sikkim, Length - 1080 M, Horse Shoe, Dia - 12.2 M.

Contract Value

: Rs. 490 Million (US$ 11 Million)

Employer

:

National Hydro Electric Power Corporation Ltd.

Major Quantities :
 Excavation in Soils :  121,528 M3
 Excavation in Hard rock :  30,761 M3
 Underground Excavation :  165,807 M3
 Concrete :  12,966 M3
 CC Lining :  51,906 M3
 HYSD :  1,728 MT
 Shotcrete :  3,065 M3
 Permanent Steel supports :  301 MT
 Rock bolts :  30,256 M
 Grouting :  789,650 KG
 
Top
 
Kamshet Tunnel on the Mumbai - Pune Expressway
Construction of Kamshet 1A Twin Tube Tunnel for Mumbai - Pune Expressway between chainages 11840 M to 12460 M, Length - 957 M, D-Shape, Dia - 18M

Contract Value

: Rs. 215 Million (US$ 5 Million)

Employer

:

Konkan Railway Corporation Ltd.,

Major Quantities :
 Excavation in Soils :  36,266 M3
 Excavation in Hard rock :  137,492 M3
 Underground Excavation :  151,711 M3
 Concrete :  9,622 M3
 CC Lining :  3,243 M3
 Shotcrete :  47,738 M3
 Rock bolts :  77 MT
 
Top
 
Khandala Tunnel on the Mumbai - Pune Expressway
Construction of Single Tube Tunnel from Ch. 6600 M to 6930 M and Widening of Existing Road Tunnel from Ch. 6600 M to 6955 M at Khandala (Mumbai End), including shotcreting, Concrete Lining, Rock Bolting etc., for Mumbai - Pune Expressway.

Contract Value

: Rs. 65 Million (US$ 1.5 Million)
Length : 330 M
D-shape  Dia : 18M

Employer

:

Konkan Railway Corporation Ltd.,

 
Top
 
Khambale Tunnel
Construction of Tunnel & Deepcut at Khambale Ch.

Contract Value

: Rs. 285 Million (US$ 6 Million)
Length : 2974 M
D-shape : 8 X 3 m.

Employer

:

MKVDC (Maharashtra Krishna Valley Development Corporation)

Major Quantities :
Excavation in Soils : 18,071 M3
Excavation in Hard rock : 157,782 M3
Underground Excavation : 140,392 M3
Concrete : 12,418 M3
HYSD : 199 MT
Permanent Steel supports : 111 MT
Rock bolts : 11,962 M
Joint Venture Partner : Gammon India Ltd.
 